Location: Stephenson Avenue, Mount Claremont, Western Australia
Client: HBF Stadium
Artist: Midnight Tuesday Artist Team (Dawn Gamblen)
Value: $85K
DENMAC Deliverables:

Feature Entry Statement Artwork with built-in TV Screen unit display

Status: October 2016
  • Architectural External Cladding
  • Construct
  • Design
  • Fabricate
  • Urban Art

This artwork was designed to be a feature statement at the entry to HBF Stadium in Mount Claremont. The art team had a design concept & contracted DENMAC for design & engineering, shop detailing, material procurement, manufacture, treatment, cladding and then installation.

The artwork comprised 1 main free-standing artwork with a built-in TV unit display which enables the stadium to promote upcoming events. There were also 2 small artworks that complemented the larger piece. The main support structure for the artworks was developed using 3D cad software to achieve an intricate ‘web’ design for the cladding material to be adhered to. The cladding material used was Aluminium Composite Panel (ACP). The products the artists selected was a combination of Ultrabond & Alpolic.

The installation of the artwork had to be well planned to ensure that good traffic management was in place & to ensure that the day to day events at HBF Stadium were not affected by the works. The project was delivered on time within a tight timeframe to ensure the artwork was complete & the TV unit was operational for their opening event in October 2016.